![]() Here are the dependency installation commands for Ubuntu 18.04 and conda: sudo apt-get install cmake g++ gcc libboost-all-dev libzmq3-dev Other environments may also work, but we unfortunately do not have the manpower to investigate compatibility issues. DependenciesĪt the moment, this is the only supported environment. ** We also thank Yuxin Wu for his help on this project. * Jerry Ma, Qucheng Gong, and Shubho Sengupta contributed equally. If you use ELF in your research, please consider citing the original NIPS paper as follows: = , There are quite a few hacks made specifically for our systems and infrastructure.ĮLF is released under the BSD-style licence found in the LICENSE file.The code quality and documentation are quite lacking, and much of the code might still feel "in-progress".It may not work reliably (or at all) on your system.This version is a successor to the original ELF platform.ĭISCLAIMER: this code is early research code. Please refer to our website for a full overview of ELF OpenGo-related resources, including pretrained models, numerous datasets, and a comprehensive visualization of human Go games throughout history leveraging ELF OpenGo's analysis capabilities. The final score is 20-0 (each professional Go player plays 5 games). We have used it to build our Go playing bot, ELF OpenGo, which achieved a 14-0 record versus four global top-30 players in April 2018. Steel is primarily produced using one of two methods: Blast Furnace or Electric Arc Furnace.ELF is an Extensive, Lightweight, and Flexible platform for game research. The blast furnace is the first step in producing steel from iron oxides. The first blast furnaces appeared in the 14th century and produced one ton per day. Factorio is a game in which you build and maintain factories. Even though equipment is improved and higher production rates can be achieved, the processes inside the blast furnace remain the same. generally require any additional ancillary equipment as with other electric steam boilers. The blast furnace uses coke, iron ore and limestone to produce pig iron.Ĭoal traditionally has been a key part of the coke-making process. The coal is crushed and ground into a powder and then charged into an oven where it is heated to approximately 1800☏ in the absence of oxygen. As the oven is heated, the coal begins to melt so most of the volatile matter such as oil, tar, hydrogen, nitrogen and sulfur are removed. The cooked coal, called coke, is removed from the oven after 18 to 24 hours of reaction time. The coke is cooled and screened into pieces ranging from one inch to four inches. The coke is a porous, hard black rock of concentrated carbon (contains 90 to 93 percent carbon), which has some ash and sulfur but compared to raw coal is very strong. The strong pieces of coke with a high energy value provide permeability, heat and gases which are required to reduce and melt the iron ore, pellets and sinter. 0 Krastorio 2 Compact 36 Matter/s from water (2160/min) 1 Woodburner 2700 mk4. Today, natural gas is increasingly being added in place of coke to the same degree in the blast furnace to reduce carbon emissions. The first electric arc furnaces (EAFs) appeared in the late 19th Century. The use of EAFs has expanded and now accounts for over 70 percent of steel production in the United States. (Apologies for lousy sound compression.)With power now resolved (for the time being) it's time to set up electric furnaces. The EAF is different from the blast furnace as it produces steel by using an electrical current to melt scrap steel, direct reduced iron, and/or pig iron, to produce molten steel.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |